BRIDGES
Services Offered
- Survey
- Geotechnical Study
- Hydrological Study
- Environmental impact
- Bridge Management Systems
- Structural Design
- Construction Supervison
- Structural Monitoring
- Turnkey
- Bridge Inspections
Rankin’s bridge portfolio includes the 1500m Litungu Lubosi Imwiko bridge across the Zambezi river, the 310m Levy Mwanawasa post-tensioned bridge across the Luapula river in Chembe, the 210m Michael Chilufya Sata bridge across the Kafue River in Chiawa and more than thirty bridges along the Zambezi River in the Barotse flood plains. In addition, Rankin has undertaken a number of projects using the Design and Build – Integrated Construction Unit method of works, taking responsibility for both design and construction of significant structures such as the Mutinondo, Kalimansenga and Nemfwe Bridges.
Rankin also has expertise in Road Asset Management Systems design and has developed the Bridge Management System for Zambia which included development of a GIS system and carrying out an Inventory and Inspection assessment of every bridge in the country, spread over more than 40,000km of road network.